top of page
Surefoot Product Range
Our range of screw types has been designed to suit a variety of applications.

T150-3 PILE
The Surefoot T150 offers exceptional versatility, making it ideal for diverse applications like decks, porches, sheds, and even solar panel installations. Its 3 pile design ensures strength and stability, while streamlining the installation process.
Load Capacity - Up to 35kN
Bolting Pattern - 147mm x 3 x 16mm Holes
Installation Time - 20 minutes approx.
Micro Piles - 3 x 32NB (Nominal Bore) 42.4OD
Galvanised Pipe

S250 - 4 PILE
The S250 is the perfect foundation for a wide variety of commercial and residential projects, from tie-downs to modular homes and much more.
Bolting Pattern -147mm x 3 x 16mm Holes
Load Capacity - Up to 75kN
Micro Piles - 4 x 32NB (Nominal Bore) 42.4OD
Galvanised Pipe Light, Medium, Heavy
Avg. installation time -10 minutes approx.

S250 - 8 PILE/8 WAY
The S250-8 pile/8way is a versatile footing which can be used for most commercial and residential projects. The 8 sleeves allow for flexibility in pile direction along with options to increase pile amount to provide additional support when required.
Bolting Pattern -147mm x 3 x 16mm Holes
Load Capacity - Up to 27 Tons
Micro Piles - 8 x 32NB (Nominal Bore) 42.4OD
Galvanised Pipe Light, Medium, Heavy
Avg. installation time -10 minutes approx.

S400 - 12 PILE
The S400 is heavily used throughout the commercial industry. It can be used for mining camps, dome shelters, modular buildings, solar farms, crane rails, light poles and much more.
Bolting Pattern - 198-250 PCD x 4 x 22mm holes, 300-350 PCD x 4 26mm x holes
Load Capacity - Up to 200kN
Micro Piles - 12 x 32NB (Nominal Bore) 42.4OD
Galvanised Pipe Light, Medium, Heavy
Avg. installation time - 20 minutes approx.

S600 - 16 PILE
The S600 is our largest footing, it can be used for double story homes, wind turbines, bridges, commercial signs and more.
Bolting Pattern - 350-400 PCD x 4 x 26mm holes, 432-500 PCD x 4 x 26mm holes
Load Capacity - Up to 300kN
Micro Piles - 16 x 32NB (Nominal Bore) 42.4OD
Galvanised Pipe Light, Medium, Heavy
Avg. installation time - 40 minutes approx.
bottom of page
